Skip to content
Relevant Contracting

Materials, tracked against the job

Capture what materials were planned and what was actually used on the job — no separate spreadsheet required.

Materials, tracked against the job — screenshot of the Relevant Contracting materials screen
Materials, tracked against the job

Materials live with the job, not in a side spreadsheet. That keeps cost tracking honest and makes closeout reconciliation possible without rebuilding the picture from receipts.

Track planned vs actual quantities, costs, and notes. The data sticks to the job for the next time you bid similar work.

How it works

  1. STEP 1
    Plan

    List planned materials when scoping the job.

  2. STEP 2
    Record

    Update actuals as the job runs.

  3. STEP 3
    Reconcile

    Close out the job with real materials in the record.

Related features

See Relevant in action

Talk to us about whether Relevant is the right fit for how your crews and subs actually work.